Free instant tools · No obligation — talk to a designer today
Free feasibility check · 60 seconds

Find Out If Your Backyard Can Pay You $2,400 a Month.

California law opened the door wider than ever for accessory dwelling units. Check whether your lot qualifies, see your rental income and payback period, then get permit-ready plans — all before you spend a dollar.

Feasibility + ROI in one Refund if your lot won't work Permit-ready plan sets
Homeowners standing at the door of their finished backyard ADU at dusk
0
typical monthly rent
from a backyard ADU
Lot feasibility firstWe tell you no for free
Rental ROI modeledPayback period, not just cost
Permit-ready setsSite, floor, elevations, structural
Feasibility refundWon't work? You pay nothing
48-hour verdictNot a two-week wait
Free tool
Find out if your lot qualifies — free, in 60 seconds.Feasibility, cost, rent, cash flow, and payback.
Check My Lot Free
Why most ADUs never get built

The project doesn't die at construction.
It dies at "I don't know if I can."

Nobody tells you if your lot qualifies

Setbacks, lot coverage, utilities, fire access, and local overlays all stack on top of state law. Most homeowners give up here, before anyone quotes them anything.

The number that matters is never shown

Everyone quotes build cost. Almost nobody shows you rent, cash flow, and payback — the only figures that tell you whether it's actually worth doing.

It feels like a two-year fog

Feasibility, design, permits, utilities, build. Without milestones, the whole thing looks like one long undefined risk — so it stays a someday project.

Free tool · feasibility + ROI

ADU Feasibility & Rental ROI Check

Six questions. You get a feasibility verdict, a cost range, projected rent, monthly cash flow, and your payback period.

Check your property

Feasibility, cost, rent, and payback

Live analysis
What kind of ADU are you considering?
Each path has a very different cost and approval profile.
How big do you want it?
Under 750 sq ft often avoids certain impact fees — worth knowing before you size up.
2 bedroom — typical layout at this size
How big is your lot?
Lot size drives what will physically fit after setbacks.
What's your main goal?
This changes what we design, not just what it costs.
Any of these on your property?
Select all that apply — each one affects feasibility or cost.
Where is the property?
Local rent and jurisdiction rules drive your entire ROI picture.

$—Estimated all-in project cost
$—Projected monthly cash flow
ADU type
Size
Projected monthly rent
Annual gross income
Simple payback period
Estimated value added to home
BestHouse design fee
Typical timeline to occupancy
What we found for your property

    Unlock your full feasibility report

    We'll email the complete analysis — rent comps, cost breakdown, permit path, and the specific constraints on your lot.

    No spam. If your lot won't support an ADU, we'll tell you plainly.
    ADU Types

    Six ways to add a unit. Very different economics.

    The right path depends on your lot, your budget, and what you're actually trying to accomplish.

    Detached New-Build ADUDetached

    Detached New-Build ADU

    A freestanding backyard unit with its own entry and utilities. Highest cost, highest rent, and the most design freedom. The category people picture when they say 'ADU.'

    Check feasibility →
    Garage ConversionConversion

    Garage Conversion

    The fastest, most affordable path — your existing garage footprint becomes a studio or one-bedroom. No new foundation, no new roof, dramatically less structure.

    Check feasibility →
    Attached ADU addition with a private entranceAttached

    Attached ADU Addition

    An addition off the main house with a separate private entrance. Shares structure and utility runs to cut cost while keeping the unit fully independent.

    Check feasibility →
    Junior ADU interior with efficiency kitchenetteJADU

    Junior ADU (JADU)

    Up to 500 sq ft carved from inside the existing home with an efficiency kitchen. The lowest-cost way to create a rentable unit — often no exterior work at all.

    Check feasibility →
    Two-story detached ADU with exterior stairTwo-Story

    Two-Story ADU

    Maximizes livable square footage on a small lot footprint. More structure and more design, but the highest space-per-square-foot-of-yard you can get.

    Check feasibility →
    ADU built above a two-car garageAbove Garage

    Above-Garage ADU

    A unit built over a new or existing garage — you keep the parking and the yard, and add a full apartment above it.

    Check feasibility →
    0
    Feasibility verdict
    0
    Typical monthly rent
    0
    JADU size limit
    100%
    Feasibility fee credited
    California ADU law

    What state law actually allows you to do

    California has spent several legislative sessions removing local barriers to ADUs. Here's the practical shape of it — and why local rules still matter.

    State law sets a floor

    Local governments cannot impose standards that make an otherwise-qualifying ADU infeasible. Cities still administer permits, but within limits the state defines.

    Setbacks are limited

    Rear and side setback requirements for ADUs are constrained by statute, which is why units can sit far closer to property lines than a main-house addition could.

    Parking rules eased

    Additional parking generally can't be required for ADUs near transit or in several other defined situations — a common blocker that no longer applies to many lots.

    Smaller units, fewer fees

    Impact fees are restricted for smaller ADUs, which is why the size you choose has a bigger effect on total cost than square footage alone suggests.

    You can't sell it separately

    An ADU generally can't be sold apart from the main house. It adds value and income to your property — it doesn't subdivide it.

    Local detail still decides

    Utility connections, fire access, height overlays, septic capacity, and historic districts are where projects actually get complicated. That's the work of a real feasibility study.

    This is general information, not legal advice, and ADU rules change. We verify the current state and local requirements for your specific parcel as part of every feasibility review.

    How it works

    From 'can I?' to keys in a tenant's hand

    Milestones, not a two-year fog. You always know what happens next.

    Designer measuring setbacks along a property line with the homeowner
    1

    Feasibility (48 hrs)

    We confirm what your lot allows under state and local rules — and tell you plainly if it won't work.

    2

    Concept & layout

    Floor plan and siting tuned to setbacks, utilities, and how you'll actually use it.

    3

    Permit-ready design

    Site plan, floor plan, elevations, structural, and energy coordination.

    4

    Permit support

    Submitted and coordinated with your city, with revisions handled until it issues.

    5

    Build & rent

    We match you with licensed contractors, then you collect rent on a documented scope.

    See a real project

    A garage became a $2,200-a-month apartment

    Follow one Southern California garage conversion end to end — the feasibility verdict, the layout decisions, the permit path, and the finished unit with a tenant in it. Real numbers, including the ones that didn't go to plan.

    Builder installing insulation during a garage-to-ADU conversion
    Case study: 420 sq ft garage conversion6:40 · Feasibility through first rent check
    Transparent pricing

    Design fees, published up front

    Construction is bid separately. This is what it costs to get a permittable ADU designed.

    Feasibility & Concept

    $997
    Credited 100% toward your design if you proceed
    • Lot analysis under state and local rules
    • Concept floor plan and siting
    • Budget range and rent projection
    • Permit path and timeline map
    • Full refund if your lot can't support an ADU
    Start Feasibility — Refunded If It Fails

    Full refund if your lot can't support an ADU

    Most chosen

    Full ADU Design & Permit Set

    $7,500
    Everything your city needs to issue the permit
    • Site plan, floor plan, and elevations
    • Structural and framing details
    • Energy compliance coordination
    • Revisions free until your permit issues
    • Rental income projection sheet
    • Contractor bid package
    Start My ADU Design

    Revisions free until your permit is issued

    Turnkey Approval

    $15,000
    We carry the permit across the line for you
    • Everything in Full Design
    • City submission managed end to end
    • Utility and fire coordination
    • Contractor matching and bid leveling
    • Priority turnaround
    See If Turnkey Fits

    Construction cost is separate and varies widely by type — garage conversions run dramatically less per square foot than detached new builds. The feasibility study gives you your real number.

    Reviews

    Owners who checked before they committed

    ★★★★★

    "The feasibility report told me my septic capacity was the real constraint — something two builders had completely skipped over. Saved me from designing a unit I couldn't have connected."

    LC
    Linda C.Homeowner · Ventura County
    ★★★★★

    "Garage conversion, permitted and rented in under a year. The cash flow projection they gave me at the start ended up within about a hundred dollars of what I actually collect."

    JV
    Javier V.Homeowner · Long Beach
    ★★★★★

    "I liked that they'd tell me no. I'd talked to three design-build firms and every one of them said yes to everything."

    PN
    Priya N.Homeowner · San Jose
    Questions

    Answers before you ask

    Will my lot even qualify for an ADU?
    That's exactly what the free tool and the feasibility study answer. California law makes ADUs broadly permissible, but setbacks, lot coverage, utility capacity, fire access, septic, and local overlays decide your specific parcel. We verify current state and local requirements for your address — and if it won't work, we tell you and refund the feasibility fee.
    How much does an ADU actually cost to build?
    It varies enormously by type. A junior ADU carved from existing space is the least expensive path; a garage conversion is next; a detached new build costs the most because you're adding foundation, roof, and full utility runs. The tool gives you a modeled range, and the feasibility study replaces it with a real number for your project.
    How long does the whole process take?
    Feasibility in about 48 hours. Design typically a few weeks depending on complexity. Permit review varies by city — this is usually the longest and least predictable stretch. Construction depends on type, with conversions moving considerably faster than new builds.
    Can I sell the ADU separately from my house?
    Generally no. An ADU adds rentable space and value to your existing property, but it doesn't subdivide the lot into a separately sellable parcel. Some narrow exceptions exist; we'll flag whether any apply to you.
    Do I need to add parking?
    Often not. State law restricts when cities can require additional parking for an ADU — proximity to transit is one of several situations where the requirement is removed. Whether it applies to you is a parcel-specific question the feasibility study answers.
    Will an ADU raise my property taxes?
    Typically the new construction is assessed and added to your existing assessment, rather than triggering a reassessment of the whole property. The specifics depend on your county assessor, so confirm with them or a tax professional — we're designers, not tax advisors.
    Do you build the ADU too?
    No. We handle feasibility, design, and permitting, then match you with licensed contractors from our network. Because we don't hold a build crew, our feasibility verdict isn't influenced by wanting the construction job.
    Tenant making coffee in the kitchenette of a finished ADU
    What it becomes

    This is the part that pays you back

    Every number on this page — the feasibility verdict, the cost range, the payback period — exists to get you here: a finished unit with someone living in it, paying rent every month.

    A 750 sq ft one-bedroom is the rental workhorse. It rents fastest, holds tenants longest, and earns the most per square foot of anything you can put in a backyard.

    Free tool · 30 seconds

    Can the Rent Cover the Loan?

    Feasibility tells you if you can build it. This tells you whether you should — the number most builders never show you.

    ADU financing check

    Monthly payment vs. monthly rent

    Instant

    $—Estimated monthly payment
    $—Net monthly after the loan
    Financing type
    Assumed rate & term
    Annual net cash flow
    Break-even on the loan

      See the whole picture

      We'll email this analysis plus the four ways California homeowners actually fund an ADU, with what each one requires.

      No spam. One email, then it's yours.
      Honest comparison

      Why this is different

      Not a list of features. The specific structural reasons the outcome is different.

       BestHouseDesign-build ADU companies
      Answer to "will my lot work?"A verdict we refund if we are wrongYes, from everyone, always
      Who checks septic and setbacksBefore you spend anything on designSometimes, eventually
      What they show youCost, rent, cash flow, and paybackBuild cost
      Incentive to say noWe do not build, so no is free to sayNone — they want the build
      If the answer is noFeasibility fee refunded in fullYou already paid for design
      The Rent-Ready ADU Blueprint

      We tell you no for free. If the answer is yes, we build the whole thing.

      Every builder in California says yes to everything. We are the only ones who will take a financial position on saying no — and refund you if your lot cannot support it.

      Full ADU design and permit setSite plan, floor plan, elevations, structural, and energy compliance coordination — everything your city needs to issue.
      $6,800
      Jurisdictional feasibility studySetbacks, lot coverage, utility and septic capacity, fire access, and local overlays checked against your actual parcel.
      $997
      Unlimited revisions until your permit issuesHowever many plan-check rounds it takes. No hourly billing, no change orders.
      $1,500
      The Rental Income Projection SheetLocal comps, realistic vacancy and maintenance holdback, monthly cash flow, and simple payback — the numbers that decide whether to build at all.
      $297
      The ADU Financing Options GuideHELOC vs cash-out refinance vs renovation loan, what each requires, and which one fits a lot like yours.
      $197
      The Permit Timeline MapEvery milestone from feasibility to occupancy with realistic durations, so a two-year fog becomes a schedule you can plan around.
      $147
      The Contractor Bid PackageYour plans reformatted into a biddable scope so builders quote the same unit and you compare on price alone.
      $397
      Total value if bought separately$10,335
      Your investment today
      $7,500feasibility credited in full

      Your lot cannot support an ADU? Full refund.

      The $997 feasibility study is refunded in full if we conclude your lot will not work — and credited 100% toward your design fee if it will. You cannot lose money finding out the truth. Then the design carries our standard promise: revisions free until your permit issues.

      We open 6 ADU design slots a month
      Four are taken. Every month a buildable lot sits empty is roughly $2,000 of rent you did not collect — and that number does not come back.
      Start My Feasibility — $997
      Refunded if your lot fails. Credited in full if it passes.
      Start My ADU Design

      Ready to find out what your backyard is worth?

      Tell us about your property and we'll come back with a real feasibility answer — including the parts other companies skip.

      Sending us files? Use your reference code.

      Drawings, measurements, photos, an inspection report, a marked-up plan — whatever you have. The code ties your files to this exact enquiry so nothing gets separated.

      Your reference
      1
      Email themSend to files@besthouse.ai with the code in the subject line.
      2
      Request an upload linkSubmit the form below and we reply within one business hour with a secure upload link already tagged to your reference.
      3
      Files too large?Put them in your own Drive, Dropbox, or WeTransfer and paste the link into the form.
      Free Lot Check Check My Lot Free
      One question before you goCan your lot even support an ADU? Find out free — we refund if we are wrong. Check My Lot
      Check your lotFree feasibility + ROI